Strange relartion between activities - by: kobetsu

$
0
0
Hello,

In result of switching activities between projects (activities which are hierarchical (contain children activities) I obtain situation where I have activity with no children (WBS 14.9.2.4) but when I try to remove it Projeqtor display warning that I will delete also 7 dependend activities.

Please take a look for picture bellow:



As you see my activity 920 has wbs 14.9.2.4... threre is no activity with deeper wbs.

I found interesting point... I have activity with no WBS:



I suppose this is reason why Projeqtor see relation but I do not see it.

When I forced to save this activity WBS was filled again correctly, activity again started to be visible in relation and on planing view.

So problem I think is, there is possibility toi damage wbs attribute in activity by using normal functionalities of Projeqtor.

Another check.... I found this" not visible activities", please take a look for the picture:



Activity with WBS 14.9.4.1 is PARENT for a activities with WBS 14.9.7.1 and WBS 14.9.7.4
but this activities are in different PROJECTS!

How can I fix this mess ? Manually means a lot of work.