We have an issue on a project about the display of "reassessed" workload.
On this project (cf. capture attached, the "reaseessed" workload is : 105.75).
The S curve displays the "assigned" workload rather than the "reassessed" workload (cf. capture attached). There is an issue on the "Coût réel du travail effectué (prévu)" curve.
Thanks,
Regards,