Hello Babynus,
I meet a problem with Cron import function of xlsx file.
I imported without problem the file in V5.3.3 but not in V5.4.2. Is there an evolution I missed?
The log file mentions that the project field, requirement type filed and status field have to be mentionned! But these informations exist in the excel file.
Regards,
ND
I meet a problem with Cron import function of xlsx file.
I imported without problem the file in V5.3.3 but not in V5.4.2. Is there an evolution I missed?
The log file mentions that the project field, requirement type filed and status field have to be mentionned! But these informations exist in the excel file.
Regards,
ND