Planning method - by: fredparis

$
0
0
Hi Babynus,

I am on a mission to a client for 2 years.
I have 5 projects to manage :

How to divide the planning ?
- each project has the same start and end dates (the dates of the mission)
- which type of planning : as soon as possible? fixed duration ?
- resource (me) : 50%, 10%, 10%, 15%, 15% (estimation of each duration) ?
- project: duration of the mission x 50% (example for the first project)?
- or each project duration = 100% of the mission and the percentage of the resource will do the calculation ?

Then, I think it's the same method to be used with activites into each projects
Thanks for this little help.
Fred