Locked users - by: ekolossov
Hi, Currently 'Locked' users still appears in the Resource Planning. I believe this is a bug - the should not be listed there.
View ArticleInstallation configuration - by: dgomez
I would like to try ProjeQtor in the frame of my company. The IT administrator would like to know more precisely what needs to be put in place to operate ProjeQtor. For instance, regarding the database...
View ArticleSEND EMAILS CONFIGURATION LOST AFTER UPGRADE V5.4.4 - by: f.arnaud@pahntos.com
Hi, We are facing the following. We have upgrade our application form V5.3.3 to V5.4.4. The conversion was done correctly. But, we have lost the configuration in Parameters\Global Parameters -->...
View ArticleUSERS PHOTOS LOST AFTER UPGRADE FROm V5.3.3 TO V5.4.4 - by: f.arnaud@pahntos.com
Hi, We have lost all photos added for each user. Is it possible to restore photos from previous version, and avoid to selec each photo for each user ? Is the photo are located in projeqtor folder...
View Article[SOLVED] project dashboard error - by: cmarechal
Hi, after updating to V 5.4.4 (Postgresql), i encounter problem with the new menu "dashboard ticket". in the file log, it is written : "2016-08-18 14:01:14.114 ***** ERROR ***** ERROR ***** 2016-08-18...
View ArticleSQL Error in log after updating to 5.4.4 - by: maged.mostafa
Hi, I upgraded from 5.3.5 to 5.4.4 and found the following SQL error in the log. Please advise about it. 2016-08-18 14:54:17.765 ===== TRACE ===== ===================================== 2016-08-18...
View ArticleTickets Dashboard (Errors in Log) - by: maged.mostafa
Hi all, Whenever I open the Tickets Dashboard, I get a long list of errors in the log. Does this mean it is not working? With just one ticket in status recorded, the dashboard filtered as in the...
View Article[SOLVED] How to make "Change History" visible to all users? - by:...
It is one of my requirements that the audit trail (i.e. Change History) should be visible to all, at all times. I could not find a way in which i can implement this. Currently, the change history is...
View ArticleHow to make dropdown visible true/ false and required true/ false? - by:...
I am making a small change in the Ticket form. Based on a particular status, I want to show Priority dropdown and make it mandatory. However, in all statuses before this, the Priority dropdown is...
View ArticleError with gantt - by: Jonathan02500
Hello, I have a question about gannt creation. When i check my gantt i can see old done projects always planned to today ? (As you can see in attachment : ) All activities are done and also my project...
View Article[SOLVED] Report "monthly planning resource/project/activity" - by: fredparis
Hi Babynus, I currently use the report "Planning > monthly planning resource/project/activity" to follow my daily activities. But planned work are added to real work. So the sum of each day and each...
View ArticleReal work allocation - Bad allocation after input - by: fredparis
Hi Babynus, Something strange that happends for the first time since I use ProjeQtOr (since 2011, october). In Real work allocation screen, when I write 0.25 and save it, that is correct. The sum of...
View Articleproblem with projeqtor report charts - by: keloniton
Dear Mr Babynus; The ticket pchart does not support right to left (RTL) languages and the results are shown in separated strange figure (check the attachment). Do you have any idea to solve the...
View ArticlePlanning method - by: fredparis
Hi Babynus, I am on a mission to a client for 2 years. I have 5 projects to manage : How to divide the planning ? - each project has the same start and end dates (the dates of the mission) - which type...
View Article[SOLVED] No control between dates (handled
Hi Babynus, In the activity screen (and perhaps not only here), it seems there is no control between the three dates : - handled = 01/08/2016 - done = 01/07/2016 - closed = 01/06/2016 So "done" can be...
View Article[SOLVED] Display Issue with Time Date - by: climb4fun
Hi Babynus, there is a minor issue in displaying time date in meetings. The box is somehow too narrow to display the whole content --> screenshot. Best regards Klaus
View ArticleReport fitting to the page - by: ekolossov
Hi, Some of the reports cannot be fit to page, so it coming in PDF without a few columns. Any suggestions how we can reduce the font size for example or split into 2 pages wide? Regards, Evgueni
View Articlecannot limit access right of a PM to a simple viewer - by: cmarechal
Hi, a have a problem of access rights i can't solve : User1 has a profile of Project Manager but in the project1 he is only a viewer (read only access - profil of viewer in the project affectations)...
View Articlecannot limit access right of Project Manager as a simple viewer for a defined...
Hi, a have a problem of access rights i can't solve : User1 has a profile of Project Manager but in the project1 he is only a viewer (read only access - profil of viewer in the project affectations)...
View ArticleError after saving change of ticket state - by: xSmorpheusSx
Hi Every time i change the state of an activity, the attached error occures. Could you please help me to solve this issue.
View Article